ISO 9001:2015IBR ApprovedEstablished 1971Full Material Traceability
GroupRequest a quote

Project supply

Teshi Group supplies the complete flanged joint and the piping around it for capital projects, plant turnarounds and long-term rate contracts. One accountable supplier for flanges, fittings, fasteners, gaskets, valves, pipe, plate and fabricated spools — documented to a single quality plan.

Scope

What a project package includes

  1. Flanges

    ASME B16.5 and B16.47, EN 1092-1 and IS 6392, and large-diameter flanges to drawing, in carbon, alloy, stainless, duplex, nickel alloys and titanium.

  2. Butt weld and forged fittings

    ASME B16.9 and B16.11 elbows, tees, reducers, caps, couplings and MSS SP-97 branch outlets.

  3. Fasteners, gaskets and valves

    Stud bolts cut to each flange, spiral wound and ring-joint gaskets, and API valves — so every joint ships complete.

  4. Pipe, plate and structurals

    Stocked and supplied from approved mills with mill certificates, on the same order.

  5. Fabricated spools and special forgings

    Spools, headers and non-standard forgings to drawing with ASME IX welding and NDT records.

How we execute
a project BOQ

Step 01

BOQ & specification review

A technical engineer reviews every line, standard and grade, and returns clarifications and deviations within 24–48 hours.

Step 02

Material allocation

Raw material from approved mills is allocated by heat number to each BOQ line before production starts.

Step 03

Manufacturing

Forging, machining and fabrication across our manufacturing units in India, with progress reported against the BOQ.

Step 04

Inspection & TPI

Stage and final inspection to an agreed QAP / ITP, witnessed by your third-party agency where specified.

Step 05

Documentation dossier

EN 10204 3.1 / 3.2 certificates, dimensional, PMI and NDT reports, and packing lists by BOQ line and heat number.

Step 06

Planned dispatch

Shutdown-critical lines first, then planned lots — in seaworthy cases for export.

Experience

Project experience

Project experience

Larsen & Toubro · AM/NS India, Hazira

Steel plant packages for blast-furnace projects, including stock house ducts for BF-2.

Project experience

Hindustan Zinc · Debari & Chanderiya

Pipe fittings for the Debari smelter project, and SS 316 stud-bolt sets with PMI reports for Chanderiya through L&T.

Project experience

Lloyds Engineering

Forged carbon steel ASME SA-105N flanges to ASME B16.5, with EN 10204 3.1 certification.

Project experience

Jindal Steel, Oman

Export flange order with seaworthy packing, packing lists by heat number and export documentation.

Project experience

Indian defence shipyards

Inspected marine flanges and fittings for naval shipbuilding programmes.

Long-term supply

Annual rate contracts & repeat buyers

Most of our work is for plants and EPC contractors that come back project after project. For regular consumption we offer annual rate contracts: fixed prices for an agreed period, call-off orders against them, reserved stock for fast-moving sizes, and the same documentation on every delivery.

We specialise in project BOQs, plant shutdowns and rate contracts. Send your BOQ, tender reference and inspection requirements, and a technical engineer will respond within 24–48 hours.

FAQ

Project supply: common questions

Can Teshi Group supply a complete project BOQ?

Yes. We quote and supply multi-line project BOQs covering flanges, butt weld and forged fittings, stud bolts, gaskets, valves, pipe, plate, structurals and fabricated spools, documented to one quality plan.

Do you work on annual rate contracts?

Yes. Annual rate contracts fix prices for an agreed period, with call-off orders, reserved stock for fast-moving items and the same documentation on every delivery.

Which inspection agencies can witness our order?

The third-party agency your project names — for example Lloyd's Register, TÜV, Bureau Veritas, SGS or EIL — can witness stage and final inspection under an agreed QAP / ITP, with EN 10204 3.2 certification.

How do you handle shutdown and turnaround deadlines?

We agree the critical lines first, reserve material against them and dispatch in planned lots, so shutdown-critical items arrive before the window opens.

Ready to build to spec?

Share your drawing, bill of materials or technical requirements with the Teshi team.